Generate a Draft Completion Design
Start with your well data → get a complete draft design, A to Z, to review. Fill in what you know; anything you leave blank is flagged in the draft as “not provided — assumption used / to be confirmed”, never silently invented. The draft is a screening-level design: review every section, tick the review checklist, and confirm it against operator standards before use.
Review the draft — 7-step checklist
Use this checklist to review the draft design above, step by step. Tick each item as you confirm it — your progress is saved on this device. Each step links to the matching draft section, its calculator, and its reference module.
Step 0 — Gather the data: reservoir, well, fluids
Every design decision downstream depends on this data. Do not start selecting equipment before the data is confirmed.
Step 1 — Choose the completion type
Decision guide — match the sandface and the number of zones to the reservoir:
| If the reservoir is… | Consider | Watch out for |
|---|---|---|
| Hard, consolidated, stable rock; no sand; single homogeneous zone | Open-hole (barefoot) | No zonal selectivity; cannot shut off water/gas |
| Soft / heterogeneous rock, multiple zones, water or gas control needed | Cased-hole, cemented & perforated (most common) | Perforation skin; only ~6–8% open area at 12 spf |
| Competent rock needing borehole support, not cement isolation | Uncemented / slotted liner | Limited isolation; slot plugging/erosion |
| Two zones at different pressures, simultaneous production | Dual / multiple-string | Cost, complex wellhead, difficult workover |
| High intervention / logging need, high rate | Monobore | Large tubulars, cost, PBR seal design |
| High-cost offshore, water/gas shut-off without intervention | Intelligent / smart completion (ICV + sensor + 2 intervals) | Cost, complexity, more leak paths |
| Unconsolidated sand, horizontal well | Open-hole gravel pack / standalone screen — see Step 5 | Running risk, plugging/erosion |
| Shale / tight rock (k < ~0.1 mD) | Horizontal + multistage frac (plug-and-perf or sliding sleeve) | Stage isolation failure, frac hits, screen-out |
Step 2 — Choose the completion equipment
Typical single-string stack, bottom to top: re-entry guide → bottom no-go nipple → perforated pup joint → top selective nipple → seal-bore extension → production packer → tubing → sliding sleeve (SSD) → side-pocket mandrels (if gas lift) → flow couplings → SSSV → tubing hanger.
Step 3 — Check pressure ratings & barriers
The lowest-rated element governs. Check every element against the same worst-case pressure–temperature–fluid envelope, in flowing and shut-in cases.
Step 4 — Choose artificial lift (or confirm natural flow)
Decision rule: the well flows naturally only if the IPR and VLP curves intersect above the minimum stable/economic rate. If not, lift is required — and a pump will not fix a plugged perforation, a closed valve, or a constrained separator, so diagnose first.
| If… | Consider |
|---|---|
| Highest rates, deep, high water cut | ESP (gas/solids sensitive; needs cable, penetrator, Y-tool if access below pump is required) |
| Gas supply available, sand / high GLR, deviated / horizontal | Gas lift (side-pocket mandrels at designed depths; valve spacing is design-specific) |
| Low rate, onshore, viscous oil, simple and reliable | Sucker-rod pump |
| Viscous oil, sand-laden, low–moderate rate | PCP (elastomer temperature/chemical limits) |
| Liquid-loaded gas well, low cost, reservoir gas energy sufficient | Plunger lift |
| Deep, deviated, abrasive fluids | Hydraulic (jet / piston) pump |
Step 5 — Check gravel pack / sand control (if needed)
Sand control is needed for unconsolidated / weakly consolidated sandstone, especially at high rate / high drawdown / high water cut and in gas wells. It is not needed for competent, well-cemented sandstone or carbonate at moderate drawdown — there, rate control below the critical drawdown (“sand management”) is the economic alternative.
Step 6 — Final check, overbalance, and handover
Overbalance is deliberately small in normal operations — typically 50–300 psi (0.1–0.5 ppg) in drilling and ~200–400 psi for completion fluid. Perforating overbalance is 100–1,000 psi; clean underbalanced perforating needs 500–1,000 psi in laboratory tests (field practice increasingly relies on dynamic underbalance).
Four key ideas
- Two independent, tested barriers at all times (NORSOK D-010 / ISO 16530-1).
- There is no universal completion — match the completion to reservoir, fluid, and well type.
- Tubing size is a nodal-analysis trade-off: too big → liquid loading / low velocity; too small → friction loss.
- Pressure ratings are one system — tubing, packer, SSSV, wellhead, and tree must all clear the same worst-case pressure–temperature–fluid envelope; the lowest-rated element governs.
Reference modules — theory behind each design step
Tap a module to read it. Use the search box above to find a topic across all modules.
How to use this app
- Offline: after the first load, the app works without internet (a service worker caches the pages).
- Install: in Chrome/Android, browser menu → “Install app” / “Add to Home screen”.
- Calculators: all calculators are for learning and initial screening only — not design numbers.
Design Calculators
For learning and initial screening only — not design. Final design uses nodal-analysis software (for example PROSPER/IPM), PVT data and well tests, and operator standards. Primary units are API (psi, ft, ppg); SI equivalents are shown where helpful.
a. Hydrostatic pressure & gradient
p = 0.052 × MW (ppg) × TVD (ft) | gradient (psi/ft) = 0.052 × MW = 0.433 × SG
b. Overbalance
Overbalance = wellbore pressure − reservoir pressure (psi and ppg)
Practice benchmarks (vary by operator): drilling 50–300 psi (0.1–0.5 ppg); completion fluid ~200–400 psi; perforating overbalance 100–1,000 psi.
c. Tubing burst — Barlow formula (API TR 5C3)
Pburst = 0.875 × (2 × Yp × t / D) — 0.875 is the API 5CT minimum-wall tolerance (−12.5%), not a safety factor. This is the pressure at which the pipe body begins to yield, not rupture.
Check connection (joint) burst separately — the joint is often weaker than the pipe body. Collapse uses the API TR 5C3 four-regime model and is not calculated here.
d. Gravel sizing — Saucier rule (SPE 4030)
D50 gravel = 5–6 × d50 formation (median of the finest producing segment, from sieve analysis)
Ratio 6–10.5: formation sand enters the pack, permeability falls. Ratio >10.5: formation sand is not retained. Frac pack uses 7–10 × d50. Screen slot in a gravel pack: slot width ≈ 0.5 × D90 of gravel. These are first-pass screening rules — final selection needs laboratory retention/plugging tests.
e. Critical velocity & critical rate, gas well — Turner / Coleman
vc = C × (ρl − 0.0031·P)¼ / (0.0031·P)½ (ft/s, P in psia) — Turner C = 5.321 (water) / 4.043 (condensate), for P > ~1,000 psi; Coleman C = 4.434 / 3.369, for P < ~1,000 psi (no 20% uplift).
Turner is a simplified correlation (droplet model, 1969) — it ignores inclination, liquid viscosity, and surface-tension variation, and field data scatter is large. Newer correlations predict higher required rates at low pressure. Use as screening; confirm with nodal analysis and well symptoms (slugging, rising casing–tubing differential).
f. Vogel IPR — flow rate vs bottomhole flowing pressure
q/qmax = 1 − 0.2(pwf/pr) − 0.8(pwf/pr)² — Vogel (1968), empirical for solution-gas drive, used when pwf is below the bubble point. Above the bubble point, the IPR is a straight line: q = J × (pr − pwf).
Vogel is an empirical correlation fitted to simulations — not a law of physics. Anchor qmax with a well test. qmax (pwf = 0) is a theoretical reference, not an achievable rate.
g. Unit Converter
Convert between the units a completion engineer uses every day — pressure, density, length, diameter, volume, rate, and temperature.
Reference: 1 psi = 6.89476 kPa = 0.0689476 bar = 0.00689476 MPa · 1 ppg = 119.83 kg/m³ · 1 ft = 0.3048 m · 1 in = 25.4 mm · 1 bbl = 0.158987 m³ = 158.987 L · °C = (°F − 32) × 5/9.
h. Tubular Volume — quick capacity formulas
Volume (m3) = ID^2 x Length (meter) / 1973 — ID in inch, Length in meter
Volume (barrels) = ID^2 x Length (feet) / 1029.4 — ID in inch, Length in feet
Length can be well length, tubing length, or casing length. Both results are calculated from the same inputs — the length is converted ft ↔ m as needed, so enter it once.
Quick rule: tubular capacity = ID^2 / 1029.4 bbl/ft — for example, 3.5-in ID ≈ 0.0119 bbl/ft, and 2.875-in ID ≈ 0.0080 bbl/ft. These are quick capacity formulas for a plain tube; they do not account for couplings, restrictions, or fluid compressibility.
Glossary
English oilfield terms, as used on the rig and in standards documents.
Sources & Notes
This app's content is summarised from two rounds of web research (28 November 2026) covering textbooks, SPE papers, and standards summaries. The full texts of API, NORSOK, and ISO standards are paid, so standards content here is reported through secondary summaries (vendor pages, lecture notes, regulators) — do not treat these summaries as verbatim quotes from the standards. Check edition numbers against the API catalogue before using standards tables for real work.
What could not be verified by the research
- API 19G scope: its exact title/scope could not be confirmed from the sources retrieved — do not cite an API 19-series sub-number from memory.
- Numeric H₂S limits for CRAs (for example duplex 10/20 kPa) come from vendor pages summarising ISO 15156-3 — verify against the ISO 15156-3 tables (which depend on pH, temperature, and chloride) before treating them as fixed limits.
- TAML Level 1 and Level 6 definitions were not confirmed from the sources retrieved (Levels 2–5 are sourced).
- Most lecture decks (Scribd / PETRONAS / Halliburton) were read through the search index only, not full text — their figures are reported as “lecture/course values”.
Main sources
- Rig3D — Well Completion (lifecycle) — rig3d.com/well-completion/
- NTNU — Well Integrity (barriers, NORSOK D-010) — NTNU wiki, Well Integrity
- Front-End Engineering — Annulus Pressure Management, MAWOP/SCP
- Sharma Technocast / Exal — API 6A pressure-rating summaries
- ZC Steel — API 5C3 casing design: collapse, burst, tension
- 30 CFR 250.518 (US BSEE rule) — tubing loads and subsea safety valves
- HSM University — Production Engineering, Inflow/Outflow, Artificial Lift
- Romanshor — Introduction to Drilling Engineering, Ch. 8 (well control / pressure)
- Halleck & Deo, SPE 16895 (1989) — laboratory underbalanced perforating
- SPE/IADC 97363 (2005) — dynamic underbalanced perforating
- Saucier (1974), SPE 4030 — gravel sizing
- Tiffin et al., SPE 39437 — standalone-screen criteria
- Turner et al. (1969), SPE 2198; Coleman et al. (1991), SPE 20280 — critical velocity
- Vogel (1968) — two-phase IPR
- King (2009) — Brines and Other Workover Fluids; Nature comparative brine study (2024)
Version
v1.0 — 28 November 2026. Educational content in English, based on public research of 28 November 2026.